Make an Inquiry

Fill in the form below and we'll get back to you shortly.

Songmao Single Side Wall Formwork SSF

Heavy-Duty Single-Sided Retaining Wall & Basement Formwork System

TECON Single Side Wall Formwork SSF is engineered for single-sided concrete pouring applications like basements and retaining walls.

Features & Benefits

  • High Pouring Height Support: Modular triangular frame stacking easily supports single-sided pour heights from 3.0m up to 8.5m.
  • Direct Load Transfer: Lateral concrete pressure is securely anchored into the foundation base slab through high-tensile anchor rods.
  • Universal Panel Compatibility: Compatible with HETO steel frame panels, H20 timber beam panels, and aluminum shuttering.
  • Safe Crane Handling: Pre-assembled bracket units can be craned together as whole operational units for rapid relocation.

Product Data Sheet

Standard Pour Heights3.0m / 4.5m / 6.0m / 7.5m / 8.5m (Customizable)
Main Support StructureWelded Structural Steel Triangular Truss (Q235 / Q355)
Anchor SystemHigh-Tensile Foundation Tie-Rods (Ø20 / Ø25mm Anchor Bolts)
Allowable Concrete Pressure50 kN/m² to 65 kN/m²
Anchor Angle45° Diagonal Heavy-Duty Push-Pull Turnbuckle
Surface FinishHot-Dip Galvanized / Industrial Anti-Corrosion Paint
Standards ComplianceEN 12812, DIN 18218, ISO 9001:2015

Assembly Tutorial

Step 01

Foundation & Layout

Verify ground level, snap reference alignment chalk lines, and secure base kickers.

Step 02

Panel Erection

Set up corner panels, connect adjacent panels with alignment clamps, and lock tight.

Step 03

Tie-Rods & Bracing

Insert tie rods with waterstop sleeves and install adjustable push-pull diagonal props.

Step 04

Inspection & Pouring

Check vertical plumb tolerance, verify locking torque, and conduct uniform concrete pour.

Frequently Asked Questions (FAQ)

What is the standard manufacturing and delivery lead time?

Standard components and catalog modular systems are dispatched within 10–20 days. Custom tailored formwork dimensions or project-specific solutions typically take 25–45 days depending on production volume.

Can Songmao customize formwork systems for special project geometries?

Yes. Our in-house engineering team provides complete structural calculations, AutoCAD shop drawings, and tailored fabrication to fit complex circular, inclined, or high-rise building geometries.

What quality certifications and load standards do your products meet?

All Songmao formwork and scaffolding systems are manufactured under ISO 9001:2015 quality management systems and comply with European EN 1065, EN 12812, and DIN 18218 standards with third-party load test reports.

Do you offer on-site assembly supervision and technical guidance?

Yes, we provide comprehensive technical manuals, step-by-step video tutorials, 3D assembly models, and on-site engineering supervision upon request for international construction sites.