Make an Inquiry

Fill in the form below and we'll get back to you shortly.

Songmao H20 Timber Beam Slab Formwork

Engineered for high structural reliability, fast cycle assembly, and superior concrete surface quality.

Versatile H20 timber beam slab shoring system suitable for slabs of any shape, thickness, and height.

Features & Benefits

Description

The TECON Slab Flex H20 shoring system is a highly flexible girder formwork system. It consists of H20 timber beams as main and secondary beams, supported by adjustable steel props or shoring towers.

Technical Specifications

Specification Details
Timber Beam Type H20 Timber Beam (height 200mm) according to EN13377
Max Slab Thickness Up to 500mm with standard spacing
Shoring Support Adjustable Steel Props class D/E or EN1065
Slab Facing 18mm or 21mm film faced plywood

System Components

  • H20 Timber Beams: Light weight and high strength timber components.
  • Tripod: Provides initial vertical stability to the steel prop.
  • Forkhead: Holds the primary H20 timber beam securely on top of the prop.

Product Data Sheet

Standard Heights1200mm / 1500mm / 2700mm / 3000mm / 3300mm (Customizable)
Standard Widths250mm / 300mm / 450mm / 600mm / 750mm / 900mm
Allowable Concrete Pressure60 kN/m² to 90 kN/m² (DIN 18218 Standard)
Main Structure MaterialHigh-Strength Q235 / Q355 Steel or 6061-T6 Structural Aluminium
Facing Material15mm / 18mm / 21mm Birch Plywood or Composite Plastic Board
Surface TreatmentHot-Dip Galvanized / High-Grade Powder Coated / Anodized
Quality CertificationISO 9001:2015, CE Certified, EN 12812 Standard

Assembly Tutorial

Step 01

Foundation & Layout

Verify ground level, snap reference alignment chalk lines, and secure base kickers.

Step 02

Panel Erection

Set up corner panels, connect adjacent panels with alignment clamps, and lock tight.

Step 03

Tie-Rods & Bracing

Insert tie rods with waterstop sleeves and install adjustable push-pull diagonal props.

Step 04

Inspection & Pouring

Check vertical plumb tolerance, verify locking torque, and conduct uniform concrete pour.

Frequently Asked Questions (FAQ)

What is the standard manufacturing and delivery lead time?

Standard components and catalog modular systems are dispatched within 10–20 days. Custom tailored formwork dimensions or project-specific solutions typically take 25–45 days depending on production volume.

Can Songmao customize formwork systems for special project geometries?

Yes. Our in-house engineering team provides complete structural calculations, AutoCAD shop drawings, and tailored fabrication to fit complex circular, inclined, or high-rise building geometries.

What quality certifications and load standards do your products meet?

All Songmao formwork and scaffolding systems are manufactured under ISO 9001:2015 quality management systems and comply with European EN 1065, EN 12812, and DIN 18218 standards with third-party load test reports.

Do you offer on-site assembly supervision and technical guidance?

Yes, we provide comprehensive technical manuals, step-by-step video tutorials, 3D assembly models, and on-site engineering supervision upon request for international construction sites.