5 Tips for Choosing the Right Concrete Formwork for High-Rise Projects

Selecting High-Rise Formwork Systems

Super high-rise buildings present unique structural and logistical challenges. Selecting the right concrete formwork system directly influences your project’s timeline, concrete finish, and site safety.

Top 5 Expert Tips

1. Evaluate the Building Geometry

Complex architectural designs require flexible framed or customized formwork profiles, whereas standard towers benefit from modular self-climbing cores.

2. Prioritize Crane-Free Climbing

At high altitudes, crane availability becomes a major bottleneck. Self-climbing platform systems (SCP) ensure continuous vertical progress independent of crane availability.

3. Focus on Cycle Time

Assess early-stripping capabilities of slab formwork systems to achieve faster floor-to-floor pour cycles (typically target 3-4 days per floor).

4. Integrate Perimeter Protection

Wind loads increase significantly at height. Integrated hydraulic protection screens are essential for securing the perimeter and protecting workers.

5. Calculate the Total Cost of Reuse

Consider the total cycles of the panels. Highly durable systems like TECON aluminium panels have a higher upfront cost but deliver a lower per-pour cost over 300+ cycles.