TECON Shoring Tower TST60
Engineered for high structural reliability, fast cycle assembly, and superior concrete surface quality.
TECON Heavy Duty Shoring Tower TST60 is modular high-capacity shoring system designed for bridges, viaducts, and heavy slab loads.
Features & Benefits
TECON Heavy Duty Shoring Tower TST60 is a modular high-capacity shoring system designed for bridges, viaducts, civil engineering tunnels, and heavy industrial floor slabs.
Product Data Sheet
Assembly Tutorial
Foundation & Layout
Verify ground level, snap reference alignment chalk lines, and secure base kickers.
Panel Erection
Set up corner panels, connect adjacent panels with alignment clamps, and lock tight.
Tie-Rods & Bracing
Insert tie rods with waterstop sleeves and install adjustable push-pull diagonal props.
Inspection & Pouring
Check vertical plumb tolerance, verify locking torque, and conduct uniform concrete pour.
Featured Projects
Frequently Asked Questions (FAQ)
What is the standard manufacturing and delivery lead time?
Standard components and catalog modular systems are dispatched within 10–20 days. Custom tailored formwork dimensions or project-specific solutions typically take 25–45 days depending on production volume.
Can Songmao customize formwork systems for special project geometries?
Yes. Our in-house engineering team provides complete structural calculations, AutoCAD shop drawings, and tailored fabrication to fit complex circular, inclined, or high-rise building geometries.
What quality certifications and load standards do your products meet?
All Songmao formwork and scaffolding systems are manufactured under ISO 9001:2015 quality management systems and comply with European EN 1065, EN 12812, and DIN 18218 standards with third-party load test reports.
Do you offer on-site assembly supervision and technical guidance?
Yes, we provide comprehensive technical manuals, step-by-step video tutorials, 3D assembly models, and on-site engineering supervision upon request for international construction sites.
