Metro Line 4 Concrete Tunnel Project

Project Background

Metro Line 4 is a critical transport infrastructure project requiring high precision in the concrete tunnel lining. TECON was selected to design and supply the customized hydraulic tunnel lining formwork carriage.

Shoring & Formwork Solutions

We engineered a self-propelled hydraulic tunnel lining trolley (length 12m) that enabled concrete pouring of a full ring section every 36 hours. Hot-dip galvanized panels were used to prevent corrosion and deliver a super-smooth concrete face.

Results

  • Zero concrete defects or honeycomb structures.
  • Project completed 15 days ahead of schedule.